Basin 2 of DP World , Sokhna Port (Excavation by Dewatering)
Project Information:
Type:
Ports & Marines Infrastructure
Owner:
DP World Sokhna
Architect:
PACER Consultants
Manager:
PACER Consultants
Contract Value:
198,500,000.00 EGP
Status:
Completed (2018)
Project Description:
The project is about dewatering of Basin Area, Excavation and transportation of 6.50 Million m³ of Excavated material with dumping outside the port.
Depth of Excavation up to 8.00 m with Average Working area 1.50 million m2.